Wednesday, September 4, 2013

Raining on my head part 2

In order to cohesively (or attempt to cohesively) cover the paint stripping process I sort of glossed over the plumbing issues so now I'm back with all the soggy details... literally.

Thankfully we purchased a home warranty with our house which in a mere three weeks we have used twice and has paid for itself 3 times over. Since we knew the warranty would cover the plumbing we had to work with them to get a plumber scheduled which ended up being highly frustrating. But in the end worth it because it meant our $700 dollar plumbing bill was really only a $60 dollar service call fee. A very good thing since we found out our warranty does not cover our ceiling damage.

Right away the plumber informed me our ceiling was toast. The ceiling in our whole downstairs is this ceiling tile which we assume is original to the house. Most of our plumbing appears to be behind it since our exterior walls, and some of our interior walls, are concrete block. To identify the leak he had to pull out several tiles to see what was going on.
Right away it was clear that there was some serious water damage behind them. They came out in crumbled pieces and were a soggy mess. 

With a clear shot of the pipes above it didn't take long for our plumber to figure out our problem. Three connections in the galvanized steel pipes coming to/from the kitchen had leaks where copper had been connected to the galvanized steel. We bought this house knowing it had galvanized steel and we actually did a lot of research on galvanized steel plumbing. They tend to have a 50-60 year life span but can last well over 100 years particularly if the system is 100% galvanized with no copper connections. The biggest place problems tend to occur is where copper and galvanized steel have been connected. Something about the metals touch and increasing corrosion. We knew going in replacing plumbing would be in our future but we'd hoped it would all hold steady for 10 years until we could do a major renovation and just redo all the plumbing, flooring and ceilings at once. Meh, onto plan b, which will be to replace sections of piping as we need to/ have the opportunity to. 

Our plumber ended up replacing this whole section of pipe with a new 25 year warranty pex piping which is apparently the latest and greatest thing in the world of plumbing. Who knew? I learn something new everyday I own this house.

Once piping was in place and water was on we were left with a big whole in our ceiling, a pile of old soggy tile and some decisions to make.

1. How do we fix our ceiling? They don't make this tile anymore so patching the whole just isn't an option
2. If we have to redo the whole ceiling do we just go ahead and redo all the plumbing in this room now?
3. How do we demo this thing? Is it asbestos? how do we find out?

Our first step is to figure out what we are dealing with regarding the ceiling and any possible asbestos. We are having a contractor come out who has experience and can tell us what we are dealing with. If it's not asbestos we will grab some dust masks and crow bars and demo it ourselves. If it is...we'll cross that bridge when we come to it. 

Until then I'm not allowed in this room because you can't be too careful when you may have asbestos on your hands especially when you are married to a loving and over protective plaintiffs attorney.:)

Tuesday, September 3, 2013

nap time, scary chemicals and rain on my head

This project, ergo, this post was supposed to go a certain way. First there was going to be documentation, second I was going to have a nifty photo showing all of the needed materials, then there was going to be a before shot, a during shot with bubbled up paint and an after shot showing wood. A brief clean up description and done. Successful project and successful blog documentation of how I stripped the paint off baseboards in the guest bedroom. 

Yeah...that's so not what happened. But before I get to all the things that went wrong lets chat about this room. Arguably this is the worst room in our house right now. The downstairs had carpet which we pulled leaving a raw concrete floor, the paint down here is in horrible shape with lots of oil residue and streaks. There was a lot of plaster repair done leaving white splotches everywhere and all of the windows would have a lovely view if it wasn't for the fetching chain link fence surrounding them right now. But this room I have big plans for. It's going to be the guest room and I can see all of it's future loveliness in my head. And with our first overnight guest scheduled to arrive in two weeks I wanted to get cracking on this space. 
Before we set up a guest bed in here I'd like to re-paint the walls, re-caulk the window frame, add curtains, change the light fixture, clean and polish the concrete (eventually we'll add flooring down here but until then polishing the concrete is a short term cheap solution) and add a nice rug. But as I got looking at this room I realized that the walnut baseboards in this room had been painted over.
This is what they look like every where else. 

After some online research and a visit to the paint store I decided to strip the paint off the baseboards and refinish them before we painted the walls or polished the concrete.

So Sunday as soon as Margot was down for her nap I headed down stairs to tackle baseboards. The first thing I did was open every single door and window as wide as I could. Then I got all my supplies together. This is where I was going to have the great photo of all the supplies needed to strip paint off baseboards except I forgot the scrapers and the cleaning solution. So imagine this photo with a Spackle knife, a plastic scraper and some TSP cleaning solution along with what you see here, the chemical stripping agent, a small bucket to pour stripper into in order to brush it on, a cheap varnish paint brush, painters tape, protective eye wear, protective gloves and a course rag. The orange bucket has the cleaning solution.

Once all of my supplies where assembled I taped off the wall along the baseboards. The paint store guys recommended this to minimize the amount of stripper on the actual wall. 

Once the baseboards were taped off I got all of my protective gear. I tend to be a little flippant regarding my attire and protective wear during projects. Can't tell you how many articles of regular clothing I have ruined with paint or bleach over the years. However, chemical stripping agents are no joke. I even wore real shoes and socks in lieu of my standard flip flops. I also wore long pants, safety glove, glasses and a scarf to keep my hair out of my eyes. Don't I look fetching! This was especially nice when one of our new neighbors came over mid project to introduce  herself.

But enough about my clothes. Back to the stripper. Once properly geared up I painted the stripper on the baseboards in one direction in a nice thick coat. Then I waited 15 minutes. This was the part where bubbles were supposed to happen. You are supposed to apply the chemical, wait, the paint bubbles up and then you scrape. No bubbles. I waited another 5 minutes and this was all I got. So I applied a second coat as directed on the can. No difference. 

 I decided to just scrape some and see what happened.
 Paint came off! But...it left more paint. I could sort of see the wood but it was underneath a stubborn, albeit thin coat of green. I kept scraping and same result. I re-read package instructions, consulted Google and determined that I was either going to have to strip in layers or sand off the remaining paint so I resumed scraping. I used two scrapers, a regular Spackle knife for the flat base of the board and a softer plastic scraper for the groves and along the top since it's really easy to gouge the wood with a Spackle knife.
I was about halfway through the room when it started softly raining on my head and ear. At first I couldn't figure out where the water was coming from. I thought maybe the open window but then I remembered it was 80 degrees and sunny out. But then I noticed a small trickle coming from the crown molding in the room. And this is the point my project really went down hill. It was of course Sunday afternoon on a holiday weekend so even though I wasted no time calling our home warranty company I didn't get very far. At that moment our friends Jeannine and Mercy came over with wine. Being my DIY mentors they know way more than me about all of this and were pretty sure the leak was coming from the intake/outtake lines from the kitchen. The kitchen is the room directly above. They explained how to turn off our water at the meter and then we all drank wine. I needed a break from paint scraping anyway. And no water meant no ability to clean up. After our wine break we figured we'd better go find our water meter. Once our water was off we loaded up Margot and walked to our neighborhood brew pub for some dinner. We thought we'd just finish scraping the paint once Margot went to sleep. Funny thing about chemical strippers is they don't work once they've dried so no paint was coming up and we still had no water to wash off all those gross scary chemicals.

The next morning we finally got the warranty company on the phone, got a plumber in and figured out what was going on. More on that tomorrow. I re-applied the paint stripper on the remaining paint, finished scraping, swept up all the paint and wiped down the baseboards and floor with the TSP cleaning agent. 

It really needs to be cleaned a second time with the TSP and a stiff brush but it was about at this point when the plumber informed he had to tear into out tile ceiling which we are concerned could have asbestos and my husband kicked me out of the now closed up room until our contractor can come take a look. So once again we have an example of how a room is going from better to worse on it's way to much much better.

As for our overnight guest, I fear she may be sleeping on a very nice air mattress in the library.

When I regain access into our guest room I'll re-clean the area with TSP and a very course brush, remove all the tape and start sanding down the rest of the paint and original varnish. Once the wood is bare I'll have to clean it very well with a deglosser before staining it back to it's lovely walnut finish. And the next time I decide to strip paint I'll so be trying the heat method instead of the scary chemicals.

The end...for now.

Friday, August 30, 2013

what we're eating

The last few months in our old house I made monthly menus instead of my usual weekly menu. Then the moving chaos hit and three months later I'm just returning to my kitchen routines. So last night I decided to make a September menu. And it was so fun! Aren't early fall menu's the best? All the summer produce is lingering but the season is starting to change and so all sorts of foods that were off the table all summer suddenly sound wonderful. I love making a menu for the whole month because I really have an excuse to spend a lot of time pouring over my cookbooks and thinking through recipes.
I also think it's fun to try and balance our meals over a whole month between different types of foods, flavors, meat/fish and lots of good meatless dinners as well. I also find it's easier each week to get organized around groceries and prep because the menu is already made.
coconut shrimp soup (Everyday food, Great Food Fast)
Indian red bean curry with brown rice (smitten kitchen blog, recipe here)
Lentil soup, buttered radishes and bread (everyday food, great food fast)
steak, pars-lied potatoes and green veg
black eyed peas, brown rice and green veg
spaghetti and salad
red bean soup (from Tom Fitzmorris New Orleans Food) 
Chicken baked in rice and green veg (from The New southern basics) 
Chicken corn chowder (gourmet magazine cutout from long ago)
Date Night
Pinto beans with bacon, rice and collard greens
Pot Roast (from The new southern basics)
pot roast hash and eggs
stewed eggplant with brown rice (The New southern basics)
Basque potato and green bean soup with garlic chips and bread (Farmhouse cookbook)
steak, roasted veg, and green
hoisen Salmon steaks, rice and Chinese broccoli (everyday food, great food fast)
roast chicken with ginger and potatoes, salad (Farmhouse cookbook)
beef stew
paneed pork chops with fennel creole sauce (Tom Fitzmorris new Orleans Food)
squash and chickpea stew (smitten Kitchen)
black bean and chorizo soup (bon appetite magazine cut out)
chili and corn bread
chicken alfredo rice casserole (better homes and garden magazine cutout)

There it is, a glimpse into what we eat...at least this month. Not that you care but I, being the food dork I am, LOVE to see what people are eating. It's like I think they have discovered some brilliant recipe/food/food blog or cookbook and I just have to know about it.

 Another sign that fall is approaching,
Rain boots!!!

Wednesday, August 28, 2013

Go out one door...

and come in another. Or so you could, because there is not one, or two but 4 doors onto our back deck. Add this to two front doors, three lower level doors to the outdoor patio and three doors in/out of the garage. The result is a whole lot of doors with a whole lot of locks.


The harrowing total is 12 doors and 17 different locks. Harrowing because one of the renovations we did before moving in was to have each lock re-keyed, several repaired and a few replaced. And 17 locks adds up. In fact the total cost to get all of these locks working and re-keyed was $330. We were prepared for several unexpected expenses like this to crop up and had a contingency set aside so it wasn't a big deal and it was very worth it to have securely locking doors with fresh keys. Plus it was kind of fun to walk through each door with the locksmith and learn a little bit about the different locks, door knobs and keys we had. And fun fact: we ended this project with three different keys into our house! So imagine Chris and I at any given time or place outside our house trying to figure out which key goes to what door. 

Almost all of the locks and door knobs were original and over half were broken. The locksmith was able to rescue 8 original knobs and locks but we had to replace the remaining 4. Luckily, the 6 really cool vintage ones, the two front door knobs and these four on the back porch,
he was able to take apart fix and reassemble.One lock even had a broken off rusty key inside! 

I file this post under "crazy things you don't even think of when you buy and old house". Because while a lot of things were going through my mind when we made our offer, old tile, mildew stains, roof leak and rose carpet, rusted out broken keys inside of non-functioning locks was not one of them. And I definitely hadn't counted how many doors there were!

Tuesday, August 27, 2013

Redesign

It was long overdue but finally I have a new updated and simplified blog design. The best part is it didn't cost a dime. My computer savvy friend Rob helped me navigate the blogger design settings and do some reformatting and the rest was some trial and error on my part. My favorite part is the header collage made entirely of iphone snap shots of us and our house' before. Perhaps someday I'll actually use my DSLR to take house photos and then they won't suck until thank goodness for the iphone. Overtime I'd love to have this collage transition to more and more after shots and show our progress.

Regardless, I'm glad to have a space to document this crazy adventure of ours!

Monday, August 26, 2013

The scariest place in our house

The truth is there are a lot a few places in my house I'm kind of scared of especially at night. And then there is the place I'm kind of scared to go in even in broad daylight.

Tucked far away in a back corner of our house is this strange staircase corridor. It connects the lower level shop to the garage and happens to be the only access directly from the inside of the house to the garage.
Up these stairs you have the unfinished crawl space on one side...

Is this not completely creepy??? I mean there could be anything back in there. 

And the platform storage space on the other. This is a huge space which goes all the way back to the wall that you can't see in the photo.It is pretty ideal for storing x-mas decorations, baby clothes etc.

Then the stairs continue up the concrete block corridor and through a door into the garage.

Mostly this space appeared to be empty except for some old screens to our windows and a random solid wood door and this very old can of paint.


Because we have so many colors going on inside our house I decided that for phase one of house renovation I'd just color match the existing off white/ivory paint for the main livings space and kitchen. Then down the road when we can tear up rose colored carpet and put in hardwood we could re-think the overall color pallet in the house. Judging from the paint drips I had a good hunch that this random can of paint was the color on our walls but I couldn't get thing open to save my life. I hauled it down to Sherwin Williams and sure enough they got it opened and confirmed it was our paint. Oh and the can, was from 1961! Do you know what happens to a can of paint after 52 years??? It gets quite hard. However, they were able to color match it and send me on my way with two new cans of our ivory paint in a nice semi-gloss perfect for our kitchen. 

And that my friends was the very long winded way of telling you that I finished painting my kitchen Friday night thanks to my Mother who came to my rescue and helped me paint until midnight and kept me from having to spend the night as the only adult in the house (Chris was backpacking). We had an impromptu sleepover, made margaritas and primed/painted until it was done.Oh yeah and she made me dinner too. Isn't my Mom so nice!

The result was pretty good. The paint is a little more yellow than what was there. You can really see the difference where the wall meets the cabinets. I suppose paint does fade a bit in 52 years. I think I'd almost call it a butter cream or a whipped butter color more than an ivory especially in the evening when the natural light goes away. Probably not what I want throughout the house but it does work in the kitchen. It is especially nice against the tile backslash behind the stove.

We will have to repaint the cabinets and door trim but we're going to wait until we replace the floor for that step. Until then it's just  nice to know we have no more raw plaster patches everywhere and we can cross off one more painting project from the giant list.

Friday, August 23, 2013

From better to worse

Sometimes things get worse before they get better, right?


At least that seems to be the case with my kitchen right now. First the oven headed to the repair shop leaving a dark scary cavernous hole. Then I taped off the windows, trim and cabinets so I could start to prime, and we all know about the aesthetic quality of blue painters tape..., and now I have a partially primed room. I thought I would at least prime it all in one evening...HAHA. Consider this example #59 of how much I underestimate the actual time a project will take.


Well tonight friends I will tackle it. Chris heads into the woods for his first backpacking trip of the season and I will prime plus paint that kitchen tonight even if I have to pull an all-nighter to do it. Meanwhile, I'll hope and pray that the painters tape sitting on my cabinets for three days doesn't do any lasting damage...